Utilizing a Milling machine, the deteriorated asphalt is recycled by grinding it into small bits.  Typically the existing asphalt is milled to a depth of 1.5 -2.0”.  The milling area is then swept clean and a prime coat is applied before a new Surface Course is placed.   This method is ideal for roadways and parking area where existing curbs and storm sewers are present and are not in need of replacement.

Grinding 1.jpg
Grinding 2.jpg